City Hwy Test Procedure


Test Procedure Description
The City Highway Test Procedure runs a cold start FTP-75 cycle and a hot-start HWFET cycle.  If TEST_CITY_HWY_HYBRID is selected then 2 complete UDDS cycles are run in place of the standard FTP-75.  Please refer to TEST_FTP documentation for the reasons for this change. The results window then displays the individual cycle results along with a combined fuel economy as calculated in the following equation:

1/((.55/MPG_city)+(.45/MPG_Hwy))

Results
The City/Highway Results Screen is shown below:

The window sticker button will open a new window with the adjusted fuel economy numbers that a consumer may see posted on the vehicle window at the time of purchase.  For more information on the adjustment factors see Window Sticker help.
 
 


Return to Chapter 3

last revised: 8/19/01(tm)